July 2nd, 2007 |
|
Looking Southeast. The existing pool equipment pad is 60" x 99". I need access to the east and west side of it.
|
July 2nd, 2007 |
|
Looking East. The Pad edge is 153.5" from the pool decking.
|
July 2nd, 2007 |
|
Looking East.
|
July 2nd, 2007 |
|
Looking East.
|
July 2nd, 2007 |
|
Looking North.
|
July 2nd, 2007 |
|
Looking North. The equipment pad is at least 73" from the fence.
|
July 2nd, 2007 |
|
Looking North.
|
July 2nd, 2007 |
|
Looking North.
|
July 2nd, 2007 |
|
Looking South.
|
July 2nd, 2007 |
|
Looking West toward the pool. The pool decking is several inches higher than the equipment pad.
|
July 2nd, 2007 |
|
Looking Southwest. The concrete pad I poured for the second shed.
|
July 2nd, 2007 |
|
Looking Southwest. There are 4 anchors dropped in 2-2.5" from the North and South sides and 7-8" in from the Est and West sides.
|
July 2nd, 2007 |
|
Looking South. The pad is at least 3 feet from the fence on the West and South sides.
|
July 2nd, 2007 |
|
Looking West.
|